Commissioned asset
Low priority28

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Asset commissioned: 5.7 MW Horizontalläufer

Jördenstorf, Mecklenburg-Vorpommern

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Jördenstorf GmbH & Co. KG
The registered asset moved from a planned MaStR operating status to a non-planned status.
Combined registered capacity across grouped units
29.7 MW
Registered units
6
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Jördenstorf, Mecklenburg-Vorpommern
Registered operator
Windpark Jördenstorf GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-08

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSame site, operator, technology and change type
These are separate MaStR registrations at the same site that share a registered operator, technology and the same kind of registry change in the same registry update. GridGraph groups them for presentation only and does not assert that this grouping represents one canonical development project.

20 Sept 2026 → 21 Sept 2026

← Back to the weekly brief · 2026-09-21