Commissioned asset
Opportunity · Low40

The opportunity score estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Opportunity score 40

  • Project scale (MW): 13
  • Event type: 6
  • Lifecycle stage: 3
  • Recency: 8
  • Operator identified: 10

Signal materiality 22

  • Event type: 12
  • MW affected: 10

Wind unit commissioned — 15 MW — MaStR SEE994857621290

Ausschließliche Wirtschaftszone · Operator: Windanker GmbH

1 unit · 15 MW

MaStR evidence: HIGHExternal verification: Not checkedGrouping: Single unit
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindanker GmbH

1 wind unit (15 MW) moved from planned to commissioned status in MaStR, with registered commissioning date 22 Aug 2026.

Why this ranks here. Mid-sized 15 MW signal and the registered operator is known. Only one registered unit; already commissioned, so it is weighted below early-stage signals; no external evidence yet.

Newly commissioned units move from planning into operation. Relevance may shift from build-phase to operating-phase services such as O&M or asset transactions; this registry change does not itself show any service need.
O&MAsset transactionsMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Registered capacity
15 MW
Commissioning date
22 Aug 2026
Lifecycle change
Planned → commissioned

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
Stable MaStR location ID: SEL957546874575
A single MaStR registration.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Betrieb

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

21 Sept 2026 → 22 Sept 2026

← Back to the brief · 2026-09-22