New planned asset
Medium priority45
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Two new planned 6 MW units in Borgentreich, Nordrhein-Westfalen — 12 MW combined
Borgentreich, Nordrhein-Westfalen
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorBürgerwindpark Borgentreich GmbH & Co. KG
Commercial interpretation
A newly registered planned asset was first observed in this MaStR snapshot.
Change summary
- Combined registered capacity across grouped units
- 12 MW
- Registered units
- 2
- First observed
- 2026-09-22
- Registered capacity
- 6 MW
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Borgentreich, Nordrhein-Westfalen
- Registered operator
- Bürgerwindpark Borgentreich GmbH & Co. KG
- Operating status
- In Planung
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (2)
SEE944389181168View official MaStR record ↗SEE961418176049View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
First tracked snapshot → 22 Sept 2026