Operator change
Low priority35

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed for 6 MW Horizontalläufer Schnarup-Thumby, Schleswig-Holstein

Schnarup-Thumby, Schleswig-Holstein

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Schnarup-Thumby GmbH & Co. KG
A registered operator change may warrant investigation of the registered asset's current commercial context.
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Schnarup-Thumby, Schleswig-Holstein
Operating status
In Betrieb
Registered operator
Windkraft Oggelberg → Windpark Schnarup-Thumby GmbH & Co. KG

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisStable MaStR location ID SEL975687416942

22 Sept 2026 → 23 Sept 2026

← Back to the latest brief