Schedule change
Opportunity · Moderate48

The opportunity score estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Opportunity score 48

  • Project scale (MW): 2
  • Event type: 12
  • Lifecycle stage: 10
  • Recency: 8
  • Operator identified: 10
  • Size of change: 6

Signal materiality 40

  • Event type: 16
  • Size of change: 22
  • MW affected: 2

Commissioning delayed by 365 days — 0.77 MW

Riesa, Sachsen · Operator: Stadtwerke Riesa GmbH

1 unit · 0.77 MW

MaStR evidence: HIGHExternal verification: Not checkedGrouping: Single unit
Asset typeVerbrennungsmotor
Energy carrierErdgas
Registered operatorStadtwerke Riesa GmbH

The registered planned commissioning date moved by +365 days (Aug 2026 → Aug 2027).

Why this ranks here. Unusually large schedule shift (365 days) and the registered operator is known. It affects only one 0.77 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.

A material schedule shift may indicate a change in project timing and could alter when supplier or service requirements arise. It may also reflect a registry correction.
Developer servicesEngineeringMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned commissioning
Aug 2026 → Aug 2027 (+365 days)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisSingle unit
A single MaStR registration.
Asset type (MaStR)
Verbrennungsmotor
Energy carrier (MaStR)
Erdgas
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

23 Sept 2026 → 24 Sept 2026

← Back to the latest brief