Opportunity · Moderate48
The opportunity score estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Opportunity score 48
- Project scale (MW): 2
- Event type: 12
- Lifecycle stage: 10
- Recency: 8
- Operator identified: 10
- Size of change: 6
Signal materiality 40
- Event type: 16
- Size of change: 22
- MW affected: 2
Commissioning delayed by 365 days — 0.77 MW
Riesa, Sachsen · Operator: Stadtwerke Riesa GmbH
1 unit · 0.77 MW
What changed
The registered planned commissioning date moved by +365 days (Aug 2026 → Aug 2027).
Why this ranks here. Unusually large schedule shift (365 days) and the registered operator is known. It affects only one 0.77 MW unit; it may still reflect a registry correction rather than a new commercial need; no external evidence yet.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Engineering and environmental services
Verify next
- Verify whether the date change reflects real rescheduling or a registry correction
- Check permitting and construction status
- Look for recent developer updates
Change summary
- Planned commissioning
- Aug 2026 → Aug 2027 (+365 days)
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE932525315508View official MaStR record ↗
Grouping basis
A single MaStR registration.
MaStR technical details
- Asset type (MaStR)
- Verbrennungsmotor
- Energy carrier (MaStR)
- Erdgas
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
23 Sept 2026 → 24 Sept 2026