Timing change
High priority76
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Commissioning delay for 60 MW Gasturbinen mit Abhitzekessel in Frankfurt am Main, Hessen
Frankfurt am Main, Hessen
Asset typeGasturbinen mit Abhitzekessel
Energy carrierErdgas
Registered operatorMainova AG
Commercial interpretation
A later registered planned commissioning date may indicate asset delay or rescheduling.
Change summary
- Combined registered capacity across grouped units
- 124.04 MW
- Registered units
- 3
- Asset type
- Gasturbinen mit Abhitzekessel
- Energy carrier
- Erdgas
- Location
- Frankfurt am Main, Hessen
- Registered operator
- Mainova AG
- Operating status
- In Planung
- Planned commissioning
- Sept 2026 → Nov 2026
- Change
- +64 days
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE918810715130View official MaStR record ↗SEE900931819460View official MaStR record ↗SEE975123428881View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
1 Jul 2026 → 11 Sept 2026