Commissioned asset
Low priority28
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Asset commissioned: 6.8 MW Horizontalläufer Ottenbüttel, Schleswig-Holstein
Ottenbüttel, Schleswig-Holstein
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindpark Hohenaspe GmbH & Co. KG
Commercial interpretation
The registered asset moved from a planned MaStR operating status to a non-planned status.
Change summary
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Ottenbüttel, Schleswig-Holstein
- Registered operator
- Windpark Hohenaspe GmbH & Co. KG
- Operating status
- In Betrieb
- Lifecycle change
- Planned → commissioned
- Commissioning date
- 2026-09-03
Additional registered changes
These units also registered the change(s) below in this same update. They are shown for completeness and do not change the primary signal above.
Operator change
- Registered operator
- Denker & Wulf AG → Windpark Hohenaspe GmbH & Co. KG
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE999733413310View official MaStR record ↗
Grouping basis
Grouping basisStable MaStR location ID —
SEL922413142965Snapshot transition
1 Jul 2026 → 11 Sept 2026