Timing change
High priority68
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Commissioning delay for 6.8 MW Horizontalläufer in Namborn, Saarland
Namborn, Saarland
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorKS Energiesysteme GmbH & Co. KG
Commercial interpretation
A later registered planned commissioning date may indicate asset delay or rescheduling.
Change summary
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Namborn, Saarland
- Registered operator
- KS Energiesysteme GmbH & Co. KG
- Operating status
- In Planung
- Planned commissioning
- Jan 2026 → Sept 2029
- Change
- +1368 days
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE961749418528View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
1 Jul 2026 → 11 Sept 2026