Operator change
Low priority35

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed for 6.8 MW Horizontalläufer Neuruppin, Brandenburg

Neuruppin, Brandenburg

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWP Manker-Protzen SWN GmbH & Co. KG
A registered operator change may warrant investigation of the registered asset's current commercial context.
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Neuruppin, Brandenburg
Operating status
In Planung
Registered operator
unlimited energy GmbH → WP Manker-Protzen SWN GmbH & Co. KG

These units also registered the change(s) below in this same update. They are shown for completeness and do not change the primary signal above.

Capacity change
Registered capacity
6 MW → 6.8 MW (+0.8 MW / 13%)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.

1 Jul 2026 → 11 Sept 2026