Low priority35
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Registered operator changed for 6.8 MW Horizontalläufer Neuruppin, Brandenburg
Neuruppin, Brandenburg
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWP Manker-Protzen SWN GmbH & Co. KG
Commercial interpretation
A registered operator change may warrant investigation of the registered asset's current commercial context.
Change summary
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Neuruppin, Brandenburg
- Operating status
- In Planung
- Registered operator
- unlimited energy GmbH → WP Manker-Protzen SWN GmbH & Co. KG
Additional registered changes
These units also registered the change(s) below in this same update. They are shown for completeness and do not change the primary signal above.
Capacity change
- Registered capacity
- 6 MW → 6.8 MW (+0.8 MW / 13%)
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE933449299387View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
1 Jul 2026 → 11 Sept 2026