Capacity change
Medium priority46
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Registered capacity reduced for 18.77 MW Kondensationsmaschine mit Entnahme Dinslaken, Nordrhein-Westfalen
Dinslaken, Nordrhein-Westfalen
Asset typeKondensationsmaschine mit Entnahme
Energy carrierBiomasse
Registered operatorDHE Dinslakener Holz-Energiezentrum GmbH & Co. KG
Commercial interpretation
A material capacity reduction indicates a smaller registered asset capacity than in the previous snapshot.
Change summary
- Asset type
- Kondensationsmaschine mit Entnahme
- Energy carrier
- Biomasse
- Location
- Dinslaken, Nordrhein-Westfalen
- Registered operator
- DHE Dinslakener Holz-Energiezentrum GmbH & Co. KG
- Operating status
- In Betrieb
- Registered capacity
- 21.98 MW → 18.77 MW
- Change
- -3.2 MW
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE991539102320View official MaStR record ↗
Grouping basis
Grouping basisStable MaStR location ID —
SEL931383732892Snapshot transition
1 Jul 2026 → 11 Sept 2026