New planned asset
Critical priority100

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 850.8 MW Gasturbinen mit nachgeschalteter Dampfturbine in Gundremmingen, Bayern

Gundremmingen, Bayern

Asset typeGasturbinen mit nachgeschalteter Dampfturbine
Energy carrierErdgas
Registered operatorRWE Generation SE
A newly registered planned asset of this size may warrant early investigation for equipment, construction, grid or professional-services opportunities.
Combined registered capacity across grouped units
979.85 MW
Registered units
29
First observed
2026-09-11
Registered capacity
850.8 MW
Asset type
Gasturbinen mit nachgeschalteter Dampfturbine
Energy carrier
Erdgas
Location
Gundremmingen, Bayern
Registered operator
RWE Generation SE
Operating status
In Planung

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.

First tracked snapshot → 11 Sept 2026

← Back to the weekly brief · 2026-09-13