Composite change
Critical priority93
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Major asset update in Spreetal, Sachsen
Spreetal, Sachsen
Asset typeGasturbinen mit Abhitzekessel
Energy carrierErdgas
Registered operatorGaskraftwerk Schwarze Pumpe GmbH
Commercial interpretation
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Change summary
- Commissioning
- Sept 2029 → Oct 2031 (+761 days)
- Registered capacity
- 870 MW → 391.17 MW (-478.83 MW / -55%)
- Registered operator
- Lausitz Energie Kraftwerke AG → Gaskraftwerk Schwarze Pumpe GmbH
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE960894923635View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
1 Jul 2026 → 11 Sept 2026