Capacity change
Low priority41

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered capacity changed for Horizontalläufer in Steinreich, Brandenburg

Steinreich, Brandenburg

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorAlterric Deutschland GmbH
A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Steinreich, Brandenburg
Registered operator
Alterric Deutschland GmbH
Operating status
In Planung
Registered capacity
4.2 MW → 7.2 MW
Change
+3 MW

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.

1 Jul 2026 → 11 Sept 2026

← Back to the weekly brief · 2026-09-13