Opportunity · Moderate55
The opportunity score estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Opportunity score 55
- Project scale (MW): 9
- Event type: 20
- Lifecycle stage: 10
- Recency: 6
- Operator identified: 10
Signal materiality 27
- Event type: 20
- MW affected: 7
New planned wind unit — 6.8 MW
Ottenstein, Niedersachsen · Operator: wpd Windpark Lichtenhagen-Ottenstein GmbH & Co. KG
1 planned unit · 6.8 MW · First observed 16 Sept 2026
What changed
A new planned wind unit of 6.8 MW was first observed in this MaStR snapshot.
Why this ranks here. The registered operator is known. It affects only one 6.8 MW unit; no external evidence yet.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Registered capacity
- 6.8 MW
- First observed in MaStR snapshot
- 16 Sept 2026
- Planned commissioning
- 01 Sept 2029
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (1)
SEE931881125646View official MaStR record ↗
Grouping basis
A single MaStR registration.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 16 Sept 2026