233 registry changes detected → 42 commercially relevant groups selected

233Registry changes detected
Every field-level change GridGraph found between the previous and current MaStR snapshot — not yet filtered for commercial relevance.
225Unique registrations affected
Each MaStR registration is counted once even if it triggered more than one change. Combined registered capacity across these registrations: 1.34 GW.
112Candidate groups formed
Changes are grouped by registration, site and change type before curation. Not every candidate group is commercially significant enough to include below.
42Curated groups shown
The highest-scoring candidate groups, capped per category, selected for this brief. See the priority score on each card for why a group was included.

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

Top changes to watch (12)

Composite change
Low priority41

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Major asset update in Jarmen, Mecklenburg-Vorpommern

Horizontalläufer

Commissioning
Aug 2028 → Mar 2028 (-153 days)
Registered capacity
4.6 MW → 7 MW (+2.4 MW / 52%)

Multiple material registration changes occurred in the same source transition and may warrant investigation.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 18 Sept 2026 → 19 Sept 2026
MaStR unit IDs: SEE904288262849

Capacity change
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered capacity changed for Horizontalläufer in Andervenne, Niedersachsen

Horizontalläufer

Combined registered capacity across grouped units
35 MW
Registered units
5
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Andervenne, Niedersachsen
Registered operator
Windpark Andervenne/Handrup GmbH & Co. KG
Operating status
In Planung
Registered capacity
6 MW → 7 MW
Change
+1 MW

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

Source lineage

Presentation group: 5 registered MaStR units
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE993980427908, SEE907764600142, SEE910487618479, SEE911227906214, SEE954827990450

Capacity change
Low priority36

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered capacity changed for Horizontalläufer in Rheda-Wiedenbrück, Nordrhein-Westfalen

Horizontalläufer

Combined registered capacity across grouped units
17.56 MW
Registered units
3
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Rheda-Wiedenbrück, Nordrhein-Westfalen
Registered operator
Rheda-Wiedenbrücker Energiegenossenschaft eG
Operating status
In Planung
Registered capacity
7 MW → 6 MW
Change
-1 MW

A material capacity reduction indicates a smaller registered asset capacity than in the previous snapshot.

Source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE964610181217, SEE977030266792, SEE931714231414

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delay for 3.3 MW Horizontalläufer in Arnsberg, Nordrhein-Westfalen

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Arnsberg, Nordrhein-Westfalen
Registered operator
Windpark Klinksberg-Humberg GmbH
Operating status
In Planung
Planned commissioning
Aug 2026 → Aug 2032
Change
+2192 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE985942633939

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delay for 6 MW Horizontalläufer in Suderburg, Niedersachsen

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Suderburg, Niedersachsen
Registered operator
Windpark Suderburg GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Sept 2026 → Dec 2027
Change
+468 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 18 Sept 2026 → 19 Sept 2026
MaStR unit IDs: SEE967813898449

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delay for 3.6 MW Horizontalläufer in Neu Wulmstorf, Niedersachsen

Horizontalläufer

Combined registered capacity across grouped units
10.8 MW
Registered units
3
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Neu Wulmstorf, Niedersachsen
Registered operator
Bürgerwind Neu Wulmstorf GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Aug 2026 → Dec 2027
Change
+487 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE998567815413, SEE952445092044, SEE919482350469

Operator change
Low priority35

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed for Horizontalläufer in Harsewinkel, Nordrhein-Westfalen

Horizontalläufer

Combined registered capacity across grouped units
25.2 MW
Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Harsewinkel, Nordrhein-Westfalen
Operating status
In Planung
Registered operator
Alterric Deutschland GmbH → New registered operator unavailable

A registered operator change may warrant investigation of the registered asset's current commercial context.

Source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE924661158088, SEE951157580276, SEE958712750662, SEE970708821767

Operator change
Low priority35

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed for Horizontalläufer in Vogelsberg, Thüringen

Horizontalläufer

Combined registered capacity across grouped units
28.8 MW
Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Vogelsberg, Thüringen
Operating status
In Planung
Registered operator
BOREAS Energie GmbH → New registered operator unavailable

A registered operator change may warrant investigation of the registered asset's current commercial context.

Source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 18 Sept 2026 → 19 Sept 2026
MaStR unit IDs: SEE957987437704, SEE985898386200, SEE910040688604, SEE993415826207

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7.2 MW Horizontalläufer in Schwedt/Oder, Brandenburg

Horizontalläufer

First observed
2026-09-16
Registered capacity
7.2 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Schwedt/Oder, Brandenburg
Registered operator
TEUT Energieprojekte GmbH
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 16 Sept 2026
MaStR unit IDs: SEE978577149425

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Barnstorf, Niedersachsen

Horizontalläufer

Combined registered capacity across grouped units
21 MW
Registered units
3
First observed
2026-09-16
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Barnstorf, Niedersachsen
Registered operator
Drebber Bürgerwindpark GmbH & Co. KG
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 16 Sept 2026
MaStR unit IDs: SEE974978989820, SEE984196010558, SEE936621932539

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Buchholz in der Nordheide, Niedersachsen

Horizontalläufer

First observed
2026-09-17
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Buchholz in der Nordheide, Niedersachsen
Registered operator
Windpark Trelder Berg GmbH & Co. KG
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 17 Sept 2026
MaStR unit IDs: SEE962620902549

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Drebber, Niedersachsen

Horizontalläufer

Combined registered capacity across grouped units
49 MW
Registered units
7
First observed
2026-09-16
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Drebber, Niedersachsen
Registered operator
Drebber Bürgerwindpark GmbH & Co. KG
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 7 registered MaStR units
Snapshot transition: First tracked snapshot → 16 Sept 2026
MaStR unit IDs: SEE981980713046, SEE998961412010, SEE993853870589, SEE923284256379, SEE905787206136, SEE946975693048, SEE947608936099

↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.

New large assets (8)

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Two new planned 7 MW units in Linnich, Nordrhein-Westfalen — 14 MW combined

Horizontalläufer

Combined registered capacity across grouped units
14 MW
Registered units
2
First observed
2026-09-18
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Linnich, Nordrhein-Westfalen
Registered operator
MLK Consulting GmbH & Co. KG
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: First tracked snapshot → 18 Sept 2026
MaStR unit IDs: SEE900947787715, SEE949151902903

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Three new planned 7 MW units in Marsberg, Nordrhein-Westfalen — 21 MW combined

Horizontalläufer

Combined registered capacity across grouped units
21 MW
Registered units
3
First observed
2026-09-18
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Marsberg, Nordrhein-Westfalen
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: First tracked snapshot → 18 Sept 2026
MaStR unit IDs: SEE944045826150, SEE915835652594, SEE962323158182

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Nuthe-Urstromtal, Brandenburg — MaStR SEE968431896619

Horizontalläufer

First observed
2026-09-19
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nuthe-Urstromtal, Brandenburg
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 19 Sept 2026
MaStR unit IDs: SEE968431896619

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Nuthe-Urstromtal, Brandenburg — MaStR SEE962508989075

Horizontalläufer

First observed
2026-09-19
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nuthe-Urstromtal, Brandenburg
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 19 Sept 2026
MaStR unit IDs: SEE962508989075

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Nuthe-Urstromtal, Brandenburg — MaStR SEE903242693163

Horizontalläufer

First observed
2026-09-19
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nuthe-Urstromtal, Brandenburg
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 19 Sept 2026
MaStR unit IDs: SEE903242693163

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Nuthe-Urstromtal, Brandenburg — MaStR SEE902314178515

Horizontalläufer

First observed
2026-09-19
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nuthe-Urstromtal, Brandenburg
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 19 Sept 2026
MaStR unit IDs: SEE902314178515

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Nuthe-Urstromtal, Brandenburg — MaStR SEE934707437565

Horizontalläufer

First observed
2026-09-19
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nuthe-Urstromtal, Brandenburg
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 19 Sept 2026
MaStR unit IDs: SEE934707437565

New planned asset
Medium priority45

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

New planned 7 MW Horizontalläufer in Nuthe-Urstromtal, Brandenburg — MaStR SEE948324399175

Horizontalläufer

First observed
2026-09-19
Registered capacity
7 MW
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nuthe-Urstromtal, Brandenburg
Operating status
In Planung

A newly registered planned asset was first observed in this MaStR snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: First tracked snapshot → 19 Sept 2026
MaStR unit IDs: SEE948324399175

↑ Back to top

Timing changes (8)

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 2 registered wind units in Nordwestuckermark, Brandenburg

Horizontalläufer

Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nordwestuckermark, Brandenburg
Registered operator
MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Dec 2026 → Dec 2027
Change
+365 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE930756682567, SEE965375636790

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 7 MW Horizontalläufer Neu Wulmstorf, Niedersachsen

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Neu Wulmstorf, Niedersachsen
Registered operator
ABO Energy WP Ohlenbüttel 2 GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Sept 2026 → Oct 2027
Change
+420 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE966325249374

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 2 registered wind units in Ostritz, Sachsen

Horizontalläufer

Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ostritz, Sachsen
Registered operator
Windpark Leuba GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Dec 2026 → Jan 2028
Change
+393 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE994718969318, SEE944980938314

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 3 registered wind units in Riepsdorf, Schleswig-Holstein

Horizontalläufer

Registered units
3
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Riepsdorf, Schleswig-Holstein
Registered operator
Gosdorfer Windenergie GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Sept 2026 → Oct 2027
Change
+395 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: 16 Sept 2026 → 17 Sept 2026
MaStR unit IDs: SEE981646345239, SEE906387470156, SEE910197833025

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 6.2 MW Horizontalläufer Oberwiera, Sachsen

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Oberwiera, Sachsen
Registered operator
Wowa GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Aug 2026 → Aug 2027
Change
+365 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE969427925818

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 4 registered wind units in Pfullendorf, Baden-Württemberg

Horizontalläufer

Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Pfullendorf, Baden-Württemberg
Registered operator
ABO Energy Windpark Pfullendorf-Denkingen GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Sept 2026 → Aug 2027
Change
+350 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE967662403658, SEE946691682654, SEE991405743596, SEE981599845879

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 5 registered wind units in Andervenne, Niedersachsen

Horizontalläufer

Registered units
5
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Andervenne, Niedersachsen
Registered operator
Windpark Andervenne/Handrup GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Jan 2028 → Sept 2028
Change
+254 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 5 registered MaStR units
Snapshot transition: 16 Sept 2026 → 17 Sept 2026
MaStR unit IDs: SEE993980427908, SEE911227906214, SEE907764600142, SEE954827990450, SEE910487618479

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 5.56 MW Horizontalläufer Friedland, Mecklenburg-Vorpommern

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Friedland, Mecklenburg-Vorpommern
Registered operator
Fried-Wind 2 GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Sept 2026 → May 2027
Change
+242 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE993028097285

↑ Back to top

Capacity changes (5)

Capacity change
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered capacity increased across 4 registered wind units in Lengerich, Niedersachsen — 28 MW combined

Horizontalläufer

Combined registered capacity across grouped units
28 MW
Registered units
4
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Lengerich, Niedersachsen
Registered operator
Windpark Andervenne/Handrup GmbH & Co. KG
Operating status
In Planung
Registered capacity
6 MW → 7 MW
Change
+1 MW

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

Source lineage

Presentation group: 4 registered MaStR units
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE964929211100, SEE957853333543, SEE964433332780, SEE909407101382

Capacity change
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered capacity increased for 7 MW Horizontalläufer Linnich, Nordrhein-Westfalen

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Linnich, Nordrhein-Westfalen
Registered operator
Ventus Bürgerstrom Kofferen Nr. 125 GmbH & Co. KG
Operating status
In Planung
Registered capacity
6 MW → 7 MW
Change
+1 MW

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE951203193535

Capacity change
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered capacity increased across 2 registered wind units in Linnich, Nordrhein-Westfalen — 14 MW combined

Horizontalläufer

Combined registered capacity across grouped units
14 MW
Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Linnich, Nordrhein-Westfalen
Registered operator
MLK Consulting GmbH & Co. KG
Operating status
In Planung
Registered capacity
6 MW → 7 MW
Change
+1 MW

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

Source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE989096479764, SEE967631317245

Capacity change
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered capacity increased for 7 MW Horizontalläufer Olfen, Nordrhein-Westfalen

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Olfen, Nordrhein-Westfalen
Registered operator
GENREO - Gesellschaft zur Nutzung regenerativer Energien in Olfen mbH
Operating status
In Planung
Registered capacity
6 MW → 7 MW
Change
+1 MW

A material capacity increase indicates a larger registered asset capacity than in the previous snapshot.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE903356207102

Timing change
High priority68

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Commissioning delayed for 2 registered wind units in Nordwestuckermark, Brandenburg

Horizontalläufer

Registered units
2
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Nordwestuckermark, Brandenburg
Registered operator
MLK Brandenburg Windpark Entwicklungs GmbH & Co. KG
Operating status
In Planung
Planned commissioning
Dec 2026 → Dec 2027
Change
+365 days

A later registered planned commissioning date may indicate asset delay or rescheduling.

Source lineage

Presentation group: 2 registered MaStR units
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE930756682567, SEE965375636790

↑ Back to top

Operator changes (4)

Operator change
Low priority35

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed across 3 registered wind units in Vogelsberg, Thüringen

Horizontalläufer

Registered units
3
Asset type
Horizontalläufer
Energy carrier
Wind
Location
Vogelsberg, Thüringen
Operating status
In Planung
Registered operator
BOREAS Energie GmbH → New registered operator unavailable

A registered operator change may warrant investigation of the registered asset's current commercial context.

Source lineage

Presentation group: 3 registered MaStR units
Snapshot transition: 18 Sept 2026 → 19 Sept 2026
MaStR unit IDs: SEE979955065719, SEE944599970217, SEE938421090761

Operator change
Low priority35

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed for 5.6 MW Horizontalläufer Kuhs, Mecklenburg-Vorpommern

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Kuhs, Mecklenburg-Vorpommern
Operating status
In Planung
Registered operator
WEB Windenergie Deutschland GmbH → WEB Windpark Kuhs GmbH & Co. KG

A registered operator change may warrant investigation of the registered asset's current commercial context.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE968763951574

Operator change
Low priority34

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed for 4.26 MW Horizontalläufer Bell (Hunsrück), Rheinland-Pfalz

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Bell (Hunsrück), Rheinland-Pfalz
Operating status
In Planung
Registered operator
Höhenwind-Park GmbH → New registered operator unavailable

A registered operator change may warrant investigation of the registered asset's current commercial context.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE947944821547

Operator change
Low priority34

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Registered operator changed for 4.26 MW Horizontalläufer Hasselbach, Rheinland-Pfalz

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Hasselbach, Rheinland-Pfalz
Operating status
In Planung
Registered operator
Höhenwind-Park GmbH → New registered operator unavailable

A registered operator change may warrant investigation of the registered asset's current commercial context.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 14 Sept 2026 → 16 Sept 2026
MaStR unit IDs: SEE988245136381

↑ Back to top

Commissioned assets (5)

Commissioned asset
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Asset commissioned: 15 MW Horizontalläufer Ausschließliche Wirtschaftszone — MaStR SEE956282536914

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ausschließliche Wirtschaftszone
Registered operator
EnBW He Dreiht GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-08

The registered asset moved from a planned MaStR operating status to a non-planned status.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE956282536914

Commissioned asset
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Asset commissioned: 15 MW Horizontalläufer Ausschließliche Wirtschaftszone — MaStR SEE977091784846

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ausschließliche Wirtschaftszone
Registered operator
EnBW He Dreiht GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-11

The registered asset moved from a planned MaStR operating status to a non-planned status.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE977091784846

Commissioned asset
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Asset commissioned: 15 MW Horizontalläufer Ausschließliche Wirtschaftszone — MaStR SEE959171440316

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ausschließliche Wirtschaftszone
Registered operator
EnBW He Dreiht GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-01

The registered asset moved from a planned MaStR operating status to a non-planned status.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE959171440316

Commissioned asset
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Asset commissioned: 15 MW Horizontalläufer Ausschließliche Wirtschaftszone — MaStR SEE980292520984

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ausschließliche Wirtschaftszone
Registered operator
EnBW He Dreiht GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-08-28

The registered asset moved from a planned MaStR operating status to a non-planned status.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 17 Sept 2026 → 18 Sept 2026
MaStR unit IDs: SEE980292520984

Commissioned asset
Low priority40

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Asset commissioned: 15 MW Horizontalläufer Ausschließliche Wirtschaftszone — MaStR SEE934812516407

Horizontalläufer

Asset type
Horizontalläufer
Energy carrier
Wind
Location
Ausschließliche Wirtschaftszone
Registered operator
Nordseecluster A GmbH & Co. KG
Operating status
In Betrieb
Lifecycle change
Planned → commissioned
Commissioning date
2026-09-15

The registered asset moved from a planned MaStR operating status to a non-planned status.

Source lineage

Presentation group: 1 registered MaStR unit
Snapshot transition: 16 Sept 2026 → 17 Sept 2026
MaStR unit IDs: SEE934812516407

↑ Back to top

Receive a filtered weekly brief for your market

Tell us which Bundesländer and technologies you care about and we'll follow up with a weekly brief scoped to that — not the full report.

Relevant Bundesländer (optional)
Relevant technologies (optional)

We'll only use this to follow up with a filtered weekly brief for your market. Read how your data is stored and how to withdraw at any time in our Privacy Policy.