Capacity change
Low priority36
This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.
What this score is built from
- Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
- Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
- Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.
Registered capacity changed for Horizontalläufer in Rheda-Wiedenbrück, Nordrhein-Westfalen
Rheda-Wiedenbrück, Nordrhein-Westfalen
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorRheda-Wiedenbrücker Energiegenossenschaft eG
Commercial interpretation
A material capacity reduction indicates a smaller registered asset capacity than in the previous snapshot.
Change summary
- Combined registered capacity across grouped units
- 17.56 MW
- Registered units
- 3
- Asset type
- Horizontalläufer
- Energy carrier
- Wind
- Location
- Rheda-Wiedenbrück, Nordrhein-Westfalen
- Registered operator
- Rheda-Wiedenbrücker Energiegenossenschaft eG
- Operating status
- In Planung
- Registered capacity
- 7 MW → 6 MW
- Change
- -1 MW
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE964610181217View official MaStR record ↗SEE977030266792View official MaStR record ↗SEE931714231414View official MaStR record ↗
Grouping basis
Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.
Snapshot transition
14 Sept 2026 → 16 Sept 2026