New planned asset
Opportunity · High71

The opportunity score estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.

Opportunity score 71

  • Project scale (MW): 18
  • Event type: 20
  • Lifecycle stage: 10
  • Recency: 7
  • Operator identified: 10
  • Multi-unit evidence: 6

Signal materiality 44

  • Event type: 20
  • MW affected: 13
  • Units affected: 11

New planned wind development signal — 5 units / 34 MW

Willebadessen, Nordrhein-Westfalen · Operator: Energiekontor AG

5 planned units · 34 MW · First observed 18 Sept 2026

MaStR evidence: HIGHExternal verification: Searched, no reliable evidence foundGrouping: Likely site group
Asset typeHorizontalläufer
Energy carrierWind
Registered operatorEnergiekontor AG

5 new planned wind units totalling 34 MW were first observed in this MaStR snapshot.

Why this ranks high. Mid-sized 34 MW signal, 5 registrations moving together, freshly registered planned asset and the registered operator is known. A targeted external search found no reliable corroborating source yet, which is not proof that the project does not exist.

External verification: Searched, no reliable evidence found

A targeted search (5 queries) found no sufficiently reliable external source for this wind development in Willebadessen. This does not show that the project does not exist. No public procurement evidence was found in this verification run.

Project company
Energiekontor AG (registered in MaStR; not confirmed externally)
Developer
Not identified
Project evidence
None
Commercial evidence
None found

We searched and found no reliable external evidence yet. This is not proof that the project does not exist.

  • Windpark Greinberg II GbR, Genehmigungsverfahren nach § 4 BImSchG in 34439 Willebadessen | UVP - UmweltverträglichkeitsprüfungenPermit document · uvp-verbund.de · Published 16 Oct 2025 · low confidenceSupports: locationVerified from page text
  • Aufstellung Teilflächennutzungsplan Windkraft zur ( ...Municipal planning document · willebadessen.de · Published 13 Jun 2023 · low confidenceSupports: locationVerified from PDF text · page 12… ie bisher in der Region verwendeten üblichen Abmessungen hinaus geht. Die Stadt Willebadessen hat mit Unterstützung der KÖTTER Consulting Engineers GmbH & Co. KG, Rheine eine zukünftig zu erwartende Größe und Konfiguration entwickelt: Als Muster wird eine Windkraftanlage mit 8 MW Leistung, 200 m Rotordurchmesser, Nabenhöhe 220 m, Gesamthö …Older source: weighed lower unless it clearly describes the same ongoing project.
  • Stadt Willebadessen Kreis Höxter Stadtteil ...Municipal planning document · willebadessen.de · Published 10 Jun 2022 · low confidenceSupports: locationVerified from PDF text · page 6… gründung zur Aufstellung des vorhabenbezogenen Bebauungsplanes Nr. 17 der Stadt Willebadessen: „Sonderbaufläche Windenergie Willebadessen“ im Stadtteil Willebadessen Sonderbaufläche Windenergie Willebadessen Seite 3 Im wirksamen Flächennutzungsplan (FNP) stellt die Stadt Willebadessen zwei Konzentrationszonen für Windkraftanlagen dar. Es …Older source: weighed lower unless it clearly describes the same ongoing project.

No public procurement evidence was found in this verification run.

No independent external sources.

Registry opportunity score: 71 (unchanged by external verification) Searched, but no reliable external evidence was found; registry score unchanged.

A multi-unit planned development of this scale may represent an early commercial signal worth investigating.
Developer servicesGrid & electricalEngineeringCivil / BOPMarket intelligence

Investigation hypotheses only. They are not evidence that any of these needs currently exist.

Planned units first observed
5
Total registered capacity
34 MW
Capacity per unit
6.8 MW each
First observed in MaStR snapshot
18 Sept 2026
Planned commissioning
31 Jan 2030

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisLikely site group
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
Asset type (MaStR)
Horizontalläufer
Energy carrier (MaStR)
Wind
Operating status (MaStR)
In Planung

MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: searched, no reliable evidence found; a targeted search found no sufficiently reliable external source, which is not proof that the project does not exist. External evidence is additional context and never replaces or downgrades the MaStR record; project corroboration is not evidence of procurement or buyer intent.

Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.

First tracked snapshot → 18 Sept 2026

← Back to the brief · 2026-09-20