Composite change
Low priority41

This score estimates how much a registry change may be worth investigating — it is not a probability, a financial estimate, or a confirmed commercial opportunity.

What this score is built from

  • Change type (18-35 pts): the kind of registry change — for example a new planned asset or a capacity increase — has a fixed base weight.
  • Registered capacity (0-35 pts): larger registered MW earns more points, in tiers at 0 MW / 10 MW / 50 MW / 100 MW.
  • Magnitude of change (0-30 pts): for changes with a measurable size — a capacity delta or a delay in days — a larger change earns more points, up to a cap.

Major asset update in Jarmen, Mecklenburg-Vorpommern

Jarmen, Mecklenburg-Vorpommern

Asset typeHorizontalläufer
Energy carrierWind
Registered operatorWindkraft Plötz
Multiple material registration changes occurred in the same source transition and may warrant investigation.
Commissioning
Aug 2028 → Mar 2028 (-153 days)
Registered capacity
4.6 MW → 7 MW (+2.4 MW / 52%)

GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.

Grouping basisConservative municipality/operator/category grouping
These registrations are grouped for presentation because they share location/operator/category characteristics. GridGraph does not assert that this grouping represents one canonical development project.

18 Sept 2026 → 19 Sept 2026

← Back to the weekly brief · 2026-09-20