Opportunity · High60
The opportunity score estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Opportunity score 60
- Project scale (MW): 15
- Event type: 20
- Lifecycle stage: 10
- Recency: 6
- Operator identified: 4
- Multi-unit evidence: 5
Signal materiality 39
- Event type: 20
- MW affected: 11
- Units affected: 8
New planned wind development signal — 3 units / 20.4 MW
Wielen, Niedersachsen · Operator: Operator ID ABR934447417711 (name not resolved)
3 planned units · 20.4 MW · First observed 17 Sept 2026
What changed
3 new planned wind units totalling 20.4 MW were first observed in this MaStR snapshot.
Why this ranks high. Mid-sized 20.4 MW signal and 3 registrations moving together. Operator identity is unresolved, which reduces immediate actionability.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Project development or development-management services
- Grid-connection / interconnection and electrical infrastructure services
- Engineering and environmental services
- Civil works and balance-of-plant
- Turbine-related services (supply, transport, installation, service)
Verify next
- Identify the developer or project company
- Check planning and permitting status
- Search municipal planning documents
- Search recent company announcements
- Search tenders and procurement notices
- Verify whether construction or supplier selection has started
Change summary
- Planned units first observed
- 3
- Total registered capacity
- 20.4 MW
- Capacity per unit
- 6.8 MW each
- First observed in MaStR snapshot
- 17 Sept 2026
- Planned commissioning
- 30 Jun 2028
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE901277924894View official MaStR record ↗SEE966660872428View official MaStR record ↗SEE984940260468View official MaStR record ↗
Grouping basis
Supporting registry evidence: Identical registered capacity; Same planned/commissioning date on every unit
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Planung
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
First tracked snapshot → 17 Sept 2026