Opportunity · Moderate46
The opportunity score estimates how actionable a registry change may be as an investigation lead. It is not a probability, a financial estimate, or a confirmed commercial opportunity. How material the registry change itself is gets a separate signal materiality score.
Opportunity score 46
- Project scale (MW): 14
- Event type: 6
- Lifecycle stage: 3
- Recency: 8
- Operator identified: 10
- Multi-unit evidence: 5
Signal materiality 31
- Event type: 12
- MW affected: 11
- Units affected: 8
3 wind units commissioned — 3 units / 18 MW
Borgentreich, Nordrhein-Westfalen · Operator: Bürgerwindpark Borgentreich GmbH & Co. KG
3 units · 18 MW
What changed
3 wind units (18 MW) moved from planned to commissioned status in MaStR, with registered commissioning dates between 17 Sept – 21 Sept 2026.
Why this ranks here. Mid-sized 18 MW signal, 3 registrations moving together and the registered operator is known. Already commissioned, so it is weighted below early-stage signals; no external evidence yet.
Why it may matter
Possible relevance
Investigation hypotheses only. They are not evidence that any of these needs currently exist.
- Operations, maintenance and technical management services
- Asset or company transaction advisory and technical due diligence
Verify next
- Confirm operating status and commissioning date in the official MaStR record
- Identify the operating company and public information on service arrangements
- Check for commissioning announcements
Change summary
- Units commissioned
- 3
- Total registered capacity
- 18 MW
- Commissioned between
- 17 Sept – 21 Sept 2026
- Lifecycle change
- Planned → commissioned
Underlying registrations
GridGraph explains what changed here; each registration below links out to its own official MaStR record for independent verification. This is a group-level view — official links are unit-level evidence.
Underlying registrations (3)
SEE933968126171View official MaStR record ↗SEE923089776072View official MaStR record ↗SEE915436468112View official MaStR record ↗
Grouping basis
Supporting registry evidence: Shared unit-name pattern (“bürgerwindpark borgentreich…”); Identical registered capacity; Planned/commissioning dates within 4 days of each other
These registrations share municipality, operator, technology and change type, and several registered facts agree. GridGraph groups them for presentation and does not assert that this is one canonical development project.
MaStR technical details
- Asset type (MaStR)
- Horizontalläufer
- Energy carrier (MaStR)
- Wind
- Operating status (MaStR)
- In Betrieb
Evidence confidence
MaStR evidence: HIGH. This describes how strongly MaStR supports the registry change itself. It does not mean the inferred commercial opportunity is real. External verification: not checked; no sources outside MaStR have been consulted.
Registry signal only. It does not establish procurement activity, construction status, contracts, financing or buyer intent.
Snapshot transition
21 Sept 2026 → 22 Sept 2026